docs(changelog): T438HGTZ.B30W is not a decoder truncation

Its Tran, Vert and MicL end 3 samples before Long in Blastware's own XML
sample table as well; the setup-field harness compared Tran's length with
the table's row count.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01ALX2R8pghDaZuti9U7mEE9
This commit is contained in:
serversdownandClaude Opus 5.5 committed 2026-10-29 18:30:27 -04:00
1 parent 29c8e2b034
commit b023083c79
1 file changed
+4 -2
+4 -2
View File
@@ -25,8 +25,10 @@ All notable changes to seismo-relay are documented here.
- Verified against Blastware's own `_XML.XML` reports for the 70,042 DL2
events that have one (2016–2026): sample rate 70,042/70,042, record
time 6,524/6,524, pre-trigger 6,484/6,484, notes 70,042/70,042, sample
count 6,523/6,524 (one waveform the decoder ends 3 samples short —
separate).
count 6,523/6,524. The one miss is the harness's, not the decoder's:
`T438HGTZ.B30W`'s Tran, Vert and MicL end 3 samples before Long, in
Blastware's own sample table too, and the harness compared Tran's
length with the table's row count.
- Events imported with an ASCII report are unchanged: the report still
overlays. Not yet read: the job number (2,997 archive events carry
one). The waveform-time estimate still finds the record time by the